Additions + whole-home renovation

Additions that read as part of the house, not an attachment.

New space for growing families and full-house renovations across the Hudson Valley—foundation to framing to the trim that ties new work into old.

Home additions

The hardest part of an addition is the seam.

Anyone can frame a box. The work that decides whether an addition looks right in ten years is where it meets the existing house: rooflines, floor heights, siding courses, trim profiles and the transitions nobody notices when they are done correctly.

Cyrwus Contracting takes on additions as one continuous scope—structure, framing, envelope and finish carpentry—rather than handing the interior to a different crew once the shell is closed in. That continuity is what keeps the details consistent from the outside in.

Whole-home renovations follow the same logic. When several rooms are moving at once, the schedule is the deliverable: what opens first, which trade follows, and which parts of the house stay livable while it happens.

Ask Marek about your project

What the work covers

Structure, envelope and everything after.

Additions vary enormously in size. The sequence does not.

01

Framing & structure

Floor systems, walls, roof framing, headers, posts and the structural connections back into the existing building.

02

Envelope

Sheathing, weather barrier, windows and doors, roofing coordination, siding and trim that matches the original house.

03

Trade sequencing

Electrical, plumbing, HVAC and insulation scheduled so inspections happen without stalling the finish work.

04

Interior finish

Drywall, flooring, doors, casing, base, built-ins and the transitions between new space and existing rooms.

Planning

What shapes an addition's scope and schedule.

Additions are the longest projects Cyrwus Contracting takes on. Understanding these variables early prevents most of the surprises.

Foundation type

A full basement, crawl space or slab each carries different excavation, drainage and cost implications, and site conditions in the Hudson Valley vary block to block.

Approvals and permits

Setbacks, zoning, septic and wetlands requirements differ by town. These are identified during planning so the responsibilities and timing are clear before work begins.

Tying into existing systems

Panel capacity, heating system capacity and existing plumbing runs often decide whether an addition is straightforward or needs upgrades elsewhere in the house.

Roofline and elevation

How the new roof meets the old one affects structure, water management and how the finished house reads from the street.

Season

Getting a structure closed in before winter changes the schedule and the working conditions for everything that follows.

From the field

Additions under construction.

Home addition framed and sheathed with new window openings, Hudson Valley NY
Addition framed and closed in
Detailed interior wall and beam framing during a home addition build
Wall and beam framing detail
Finished kitchen inside a completed home renovation with charcoal cabinetry
Interior finish after structure
See the full project gallery

Where we work

Home additions across three Hudson Valley counties.

Cyrwus Contracting is based in Stormville, New York and works throughout Pawling, Holmes, Poughquag, Hopewell Junction, Patterson, Brewster, Carmel, Mahopac, Katonah, North Salem, Somers and the surrounding communities of Dutchess, Putnam and Westchester Counties.

See the full service area

Before you call

Addition and renovation questions.

Do you handle permits for an addition?

Permit and approval requirements vary by municipality and scope. They are identified and discussed during planning so responsibilities and next steps are clear before applicable work begins.

Do I need an architect or engineer?

Most additions do require drawings, and structural work usually requires an engineer's involvement. Marek can tell you early what your project will need and works alongside the designers homeowners bring in.

Can we live in the house during an addition?

Often, yes—additions are usually built alongside the existing house and only connect to it at specific points. The disruptive stretches are identified in advance.

Do you build garage additions?

Yes. Attached garages, garage additions with space above and bump-outs for mudrooms and entries are all part of the work.

How far in advance should we start planning?

Additions have the longest lead time of any residential project once design, approvals and scheduling are accounted for. Starting the conversation early is the cheapest thing you can do.

A direct first step

Talk with the person who will lead the work.

Share the room, your town and what you would like to change. Estimates are free, and the first conversation is with Marek—not a salesperson.

Request a free estimate
Call for a free estimate